Basic personal resume
Name: Sex: Male
Current location: Qingdao, Shandong Nationality: Chinese
Domicile: Weihai, Shandong height and weight: 183cm/75kg
Marital Status: Single Age: 25
Job search intention
Expect the nature of work: Full-time
Desired Occupation: architect / civil engineer, real estate development / planning, project management / bidding, urban planning
Desired Industry: Real Estate / Construction / Building Materials / Engineering
Expectations Work areas: Tianjin, Beijing
Expected Salary: 4001-6000 RMB / month
Current situation: I am currently working, is considering a change in the new environment (if any suitable job opportunities, duty hours a month or so)
Self-evaluation
XX I graduated from the Department of Civil Engineering, lively and cheerful in the lack of steady, introverted, with a high sense of responsibility and affinity, the flexibility, creative, passionate work, serious and responsible, able to face setbacks and failures, never give up, focus on teamwork, good personnel management, organizational planning coordination and communication skills, and has a strong ability to learn, have the ability to solve unexpected events, with strong language skills and capacity for expansion. I have practical work hard, familiar on-site business, work completed during their main work things, self-QC, green building and other conservation-oriented management approach and in line with the concept of social development, building new materials and new technologies, and in July 2009 Excellent QC team won the national team title.
Work experience
1,2008.4-2010.4 XX project
XX project is located in Hongqiao District, Hai Yuan Dao Jiaokou Unity Road and a total of 14 buildings of the total construction area of 170,000 square meters of affordable housing projects, a minimum of up to 32 layer 18 layer. I started piling in this project from acceptance to completion of the project, organized during the on-site coordination of all construction teams and all foreign events. And pay close attention to quality and safety and progress of the project, which was awarded a total of seven buildings in the Haihe River Cup, the party secretary has come to the scene and spoke highly of.
2,2010.4-2010.11 Nantouyao Mu Wan li li and public buildings and Wanhua building project
This project is located in Hongqiao District Youth Road and Yihua Road intersection, Mu-li works for a total of 15 buildings total floor area of 135,15 square meters of commercial housing. Wanhua 24 floor building to apartments, is one of Hongqiao District landmark.
3,2010.11 - XX project so far
XX The project is located within the original Academy of Agricultural Sciences, is the largest limit commercial XX total construction area of 400,000 square meters. The project of 51 residential buildings, up to 29 layers, a minimum of 11 layers, checking the project for the Ministry of Construction is one of key projects for on-site project quality, safety and civilized construction and standardization of so to get city leaders praise the leadership BMCC .
Duties and tasks in the above works, I simply attributed to the following:
1, to assist with the pre-engineering procedures, the inspection team bidding to select. To assist the drafting of tender documents, tendering, construction work of the signing of the contract.
2, familiar with the construction drawings, technical tests, the organization reviews and drawings of the drawings there are issues and recommendations in a timely manner to report to the leaders in charge, together with relevant departments to solve.
3, the implementation of leveling, the construction unit organizational approach to coordinate external relationships within the construction site.
4, check the construction unit to establish a sound quality management system, review the construction program and construction methods. Strengthen the project site inspections and supervision, the phenomenon of illegal operation to correct in time, do check and concealed the transfer process engineering check and acceptance work.
5, review the construction of units for material submitted a plan. On the approach of materials, equipment according to design requirements and specifications related to inspection and acceptance, to ensure admission materials, equipment quality.
6, the construction unit in the preparation of the total schedule of specific measures taken, progress control, schedule achievement of objectives and risk analysis to check the possibility of demonstration and control the execution in the implementation process to ensure the realization of the contract period.
7, to strengthen the construction site safety in production and civilized construction management, the existence of safety hazards and promptly correct violations of safety rules.
8, to assist leaders in charge, the functions of sections of the unified management of design changes. Changes involving investment, more emphasis on program selection.
9, with the audit department to complete the settlement of the project audit. In a timely manner to change the amount of work measurement, true and complete to provide audit information.
10, tissue engineering inspection, completion of the project information to assist with the transfer and record work.
11, make a return visit to work with the completion of projects, the quality problems, coordinating construction in a timely manner rework.
12, to complete other work assigned by the leadership.
温馨提示:答案为网友推荐,仅供参考