With the further acceleration of domestic city procedures, water supply and drainage engineering has gradually developed into an important infrastructure for city construction and industrial production and a basic safeguard of human life health safety and the agr-industry, sci-tech and production development. Whereas it is more significant that the rain and sewage drainage engineering impacts on city environmental protection of water body and the natural circulation.
This graduation design requires DD: (1) city drainage system design including two items ----the city rain water drainage system and sewage drainage system design, used in the design of drainage system.
For the rainwater drainage system design, firstly, two or more drainage schemes are made, and more reasonable schemes are carried on and selected; after the optimal scheme determined, the pipeline layout and partition design must be made out to determine the pipe inspection well position, and numbered the pipe and the inspection well at the same time as per the regulations. Subsequently, the whole city catchment area, numbers are divided and the size measured. After that, according to the size and the related data, each pipe section of the design flow must be calculated; through hydraulic calculation table, each pipe section diameter, slope and velocity and other parameters are drawn, and therefore each pipe section of the elevation data is reached Finally, the calculated parameters are marked on a planar graph of the corresponding position, and the calculation specification is compiled.
For the city sewage drainage system, two or more kinds of drainage schemes are determined, the scheme comparison and a more reasonable scheme selection are needed; after the optimal scheme determined, according to the system design methods for rainwater drainage and the combination of sewage drainage system, relevant information and specification, the parameters of the sewage pipe can be calculated; finally, the calculated parameters are marked on a planar graph of the corresponding position, and the preparation of calculation specification is compiled..
After the completion of the two projects, as the specific requirements, the design results must be mapped out and related drawings must be hand-drawn.
The graduation design contents all above
Key words: drainage, shunt system, drainage system, sewage drainage system.