第1个回答 2009-07-03
2003|10-2004|1:Weigh to celebrate a harbor sail a bureau to roll a shipment management information system
Software environment:UNIX
Hardware environment:AIX
Develop tool:JAVA(STRUTS,JSP,JAVABEAN,JSP TAG),WEBSPHERE 5.0
The item describes:Adopt a struts technique.That system is to the ex- version C|the S system get stripe the web application of development.Main containment parking lot management, plan management, sell a ticket to manage the three greatest businesses mold piece.
The responsibility describes:The manager of the item.Be responsible for the item whole process plan.The main technique makes policy, main development personnel.
--------------------------------------------------------------------------------
2003|3-2003|10:The area housing project in Yu manages information system
Software environment:Windows 2000, jrun 4
Develop tool:Oracle, java(j 2 ees)
The item describes:Adopt B|S structure, use jsp+the javabean technique carry out of web application.That system includes a file management, leasing management and month to rent charge and this Li to owe, business etc. business mold piece.Can automatically assess rental and carry on a batch quantity to adjust to rent according to the policy.Workload and rental that biggest lowered a personnel manage the loophole of aspect.
The responsibility describes:The manager of the item.Be responsible for an item investigation and analyze the establishment of design, technique frame, and is a main backstage logic to write a personnel.
--------------------------------------------------------------------------------
2002|10-2003|1:Maya Mr. hands over management system
Software environment:windows2000
The item describes:The plan, operation, safety, energy, supplies that hands over profession to Mr., maintain etc. all-directions comprehensive management system
The responsibility describes:The development, implementation and text file that mainly is responsible for supplies system writes.
--------------------------------------------------------------------------------
2002|8-2002|9:Heavy celebrate Yu to reach machine factory of logistics system
Software environment:windows2000
Develop tool:PB,ORACLE
The item describes:Include database building, sale and produce the logistics system of whole processeses
The responsibility describes:Design, code, test, carry out, the text file write
--------------------------------------------------------------------------------
2002|1-2002|6:Turn CAPP according to the integration of 3D design software
Software environment:Windows 98
Hardware environment:PII
Develop tool:PB
The item describes:Combine a Soldedge assistance technological design.
The responsibility describes:Item management, detailed design.
--------------------------------------------------------------------------------
2001|3-2001|12:IERP manages system
Software environment:internet
Hardware environment:Cross-platform
Develop tool:java
The item describes:According to connect ERP of network to manage system with each other.
The responsibility describes:The backstage business logic develops.
--------------------------------------------------------------------------------
2000|6-2001|3:Human resource manages system
Software environment:win98
Hardware environment:PII
Develop tool:PB,Oracle
The item describes:Include a talented person follow, personal management, wages management, test frequently management of comprehensive management information system.
The responsibility describes:Item management, need analysis, first step design, detailed design, code, test, the text file write, implementation.
汗汗汗
第2个回答 2009-07-03
2003/10--2004/1: Chongqing PMB Ro-Ro Ship Management Information System
Software Environment: UNIX
Hardware environment: AIX
Tools: JAVA (STRUTS, JSP, JAVABEAN, JSP TAG), WEBSPHERE 5.0
Project Description: Using struts technology. The system of previous versions of C / S system, the upgrading of the web application development. Contains the main car park management, program management, ticket management module three operations.
Responsibility Description: Project Manager. Responsible for the entire process of project planning. Main technical decision-making, the main developer.
-------------------------------------------------- ------------------------------
2003/3--2003/10: Gongfang Yuzhong District Management Information System
Software Environment: windows2000, jrun4
Tools: oracle, java (j2ee)
Project Description: The B / S structure, using jsp + javabean of web application technology. The system includes records management, leasing management, and monthly charges owed to the calendar, such as business services module. Can automatically assess the rent, and mass transfer in accordance with the rental policies. Greatly reduces the workload of staff and loopholes in the rental management.
Responsibility Description: Project Manager. Responsible for project research, analysis and design, technical framework for the formulation, and as the main authors of the background logic.
-------------------------------------------------- ------------------------------
2002/10--2003/1: Maya Bus Management System
Software Environment: windows2000
Project Description: The plan of the bus industry, operation, security, energy, material, maintenance management system, such as omni-directional
Responsibility to describe: the system is mainly responsible for the development of materials, implementation, preparation of documents.
-------------------------------------------------- ------------------------------
2002/8--2002/9: Machinery Factory of Chongqing Logistics Management System
Software Environment: windows2000
Development tools: PB, ORACLE
Project Description: includes the Treasury, sales, the entire process of production logistics management system
Responsibility Description: design, coding, testing, implementation, documentation preparation
-------------------------------------------------- ------------------------------
2002/1--2002/6: Based on the three-dimensional design software integrated CAPP
Software Environment: Windows 98
Hardware: PII
Development tools: PB
Project Description: auxiliary Soldedge combination of process design.
Description responsibility: project management, detailed design.
-------------------------------------------------- ------------------------------
2001/3--2001/12: IERP Management System
Software Environment: internet
Hardware environment: cross-platform
Development tools: java
Project Description: Based on the interconnection of the ERP management system.
Responsibility Description: the background to develop business logic.
-------------------------------------------------- ------------------------------
2000/6--2001/3: Human Resource Management System
Software Environment: win98
Hardware: PII
Development tools: PB, Oracle
Project Description: includes personnel tracking, personnel management, payroll management, attendance management, integrated management information system.
Description responsibility: project management, needs analysis, preliminary design, detailed design, coding, testing, document preparation, implementation.本回答被提问者采纳