第1个回答 2008-09-18
Do not cut power belt load replacement high pressure isolator operating method research Abstract: High pressure isolator in the 10kV distribution network indispensable, mainly installs in distribution line's contact point, the partition place, the branch line and so on place, forms the obvious cut-off point in the electric circuit, and participates in the change movement way massively the floodgate operation but actually, therefore presents like this such breakdown unavoidably. Because the live-wire work may create the huge economic efficiency and the social efficiency, therefore in has under the live-wire work premise to be possible to adopt charged processing this kind of breakdown generally, the work method may adopt the belt load or the idling carries on replaces two ways, but considered in reality isolator's damaged condition (sometimes causes isolator to be unable the loss which separation) and the power cut creates, the main method needs to adopt the belt load replacement isolator. Key words: High pressure isolator; Belt load; Replacement
参考资料:记得赏分了 。。。谢谢
第2个回答 2008-09-11
Do not replace the high-voltage electricity load isolation method of switching operations
Abstract: High-pressure isolation switch in the 10 kV distribution network in the essential, the main power distribution lines installed in the focal point, Sub-Department, the branch lines, etc., in a clear disconnect the circuit, and heavily involved in the operation to change the way inverted Gateway operation, so inevitable that this or that kind of failure. As Charged operations can create enormous economic and social benefits, so charged with operating under the premise of general charged can be taken to deal with such failure, the method of operation can be taken on-load or no load to be replaced in two ways, but in practice Disconnectors consider the extent of damage (sometimes lead to isolation switch can not be disconnected) and the losses caused by power failure, the main method is to take load isolation switch replacement.
Key words: high-pressure isolation switch;-load; replacement本回答被网友采纳
第3个回答 2008-09-13
Do not replace the high-voltage electricity load Disconnectors practices of Abstract: High-pressure isolation switch in the 10 kV distribution network in the essential, the main power distribution lines installed in the focal point, Sub-Department, the branch lines, etc., in the form of the circuit Obvious disconnect, and heavily involved in changing the operating mode switching operation, so difficultAvoid this or that kind of failure. As Charged operations can create enormous economic and social benefits, so charged with operating under the premise of general charged can be taken to deal with such failure, the method of operation can be taken on-load or no load to be replaced in two ways, but in practice test